Worth Long Lead-in Gray Garden Hose 5/8 in. x 50 ft. -Kink Free, No Leaking, Male/Female Fittings -Heavy Duty Durable Flexible Lightweight Water Pipe -Brass Aluminum Ends for Household & Yard Use
30-pt tracked
$39.99

Worth Long Lead-in Gray Garden Hose 5/8 in. x 50 ft. -Kink Free, No Leaking, Male/Female Fittings -Heavy Duty Durable Flexible Lightweight Water Pipe -Brass Aluminum Ends for Household & Yard Use

★★★★☆ 4.2/5 (80,080 reviews) #78,787 in Patio, Lawn & Garden

$39.99

Price accurate as of Aug 5, 2026. Check current price on Amazon.

See Price on Amazon

This Worth Garden item is priced 55% below the 239,759-product Patio, Lawn & Garden average of $89.42, and rated below the category's 4.3-star average.

Specifications

BrandWorth Garden
CategoryPatio, Lawn & Garden
ASINB08P4ZFB8H
Listed SinceJul 11, 2026

Price History

Checked 30 times, trending flat — a real price history, not a one-time listing.

DatePrice
Aug 5, 2026$39.99
Aug 4, 2026$39.99
Aug 3, 2026$39.99

Best-Seller Rank History

Amazon's own sales rank within Patio, Lawn & Garden, over time.

DateRank
Aug 5, 2026#78,787
Aug 4, 2026#78,787
Aug 3, 2026#78,787
Last checked Aug 5, 2026 11:00pm

Common Questions

Is this a good price for Patio, Lawn & Garden?

At $39.99, this is about 55% below the 239,759-product Patio, Lawn & Garden average of $89.42.

How well does this sell compared to other Patio, Lawn & Garden products?

It's ranked #78,787 in Patio, Lawn & Garden by Amazon's own best-seller rank, and its price has been trending flat over our last 30 price checks.

How reliable is the 4.2 star rating?

It's based on 80,080 Amazon reviews, compared to a Patio, Lawn & Garden category average of 4.3 stars.